Avery Power & Light Home Layout


In an effort to get a bit of "Run time" the layout is a folded loop.  Trains leaving Avery westbound pass Plummer to get to
St. Maries.  Likewise trains leaving St. Maries westbound pass Avery to get to Plummer.  West of Plummer is the staging
yard which leads back to the east end of Avery.
Click on the thumbnails for full size views.

In the beginning.  March 21st, 2005
Avery on the left, helix base on the right.

 

March 21st, 2005
St. Maries on the left, Plummer under the court house.  The court house module is also part of the portable layout.  Here it represents one end of the traction line that runs through Upper Avery.  Nine days earlier there was a pool table under those raised lights!

 
   

March 21st, 2005
Another view of Avery and the future location of Pine Tree Mines mine number six.

Pine Tree Mine above Avery. October 2005.  Line poles installed ready for overhead wire.  Avery is next.

 
   

A slightly disastrous first passenger run!

East Avery at the extreme left overlooking the line from Plummer to St. Maries.

 
   

The helix with the park area on top which is the other end of the Upper Avery traction line.

Time warp - Apri1 1st, 2006 Open House

Main Line between Avery & St. Maries with Plummer off to the left.

 
   

SP & S traffic on the Main Line at Avery.

 

SP & S train crossing the swinging gate on the Main Line between
Avery & St. Maries

The swinging gate is just that, a thirty inch wide swinging door
for access into the layout.  I don't do duckunders!

 
   

Pine Tree Mine #6 - Still waiting for overhead wire.

St. Maries

 
   

Park on Main Street in Upper Avery

6/25/08